词语吧>英语词典>cable length翻译和用法

cable length

英 [ˈkeɪbl leŋθ]

美 [ˈkeɪbl leŋθ]

链(英国608英尺,美国720英尺);电缆长度;线长;电线长度

英英释义

noun

双语例句

  • The results of simulation and engineering applications indicate that the wavelet de-noising processing with the decomposition level determined by the adaptive selection algorithm can effectively filter out the noise from the TDR signal and then improve the measuring accuracy of the TDR cable length measurement system.
    仿真结果和工程应用结果表明,采用该方法确定的小波分解层数对被测信号进行消噪处理,可以有效的滤除信号中的噪声,提高时域反射电缆测长系统的测量精度。
  • The propagation process of pulse wave in the cable and influence of cable length on overvoltage and wavefront time of winding are discussed in this paper.
    讨论了脉冲波在电缆中的传播过程以及电缆长度对线圈端的过电压和脉冲上升时间的影响。
  • Measurement of the Coaxial Cable Length
    同轴电缆长度的测量
  • As a kind of pre-stressed structures, the most important factor of the deviation of the initial shape and initial pre-tension of cable-strut tensile structures is the member length error ( cable length error and strut length error, hereinafter referred to as "length error").
    作为一类预应力结构,构件长度误差(即索长和杆长误差,以下简称为长度误差)是造成索杆张力结构初始形态和初始预张力偏差的最主要因素。
  • First, the initial status and the initial cable length were calculated by means of controlling the cable force and the internal force of all members in the pre-stressed state were obtained at the same time.
    首先通过控制索在预应力态下的张拉力求得零状态和索原长,并同时获得预应力态下所有单元的内力。
  • In the oil and gas field development process, the well depth measured by measuring the length of running cable, but the current cable length measurement mainly by motor and Martin Dyke wellhead two measurement methods.
    油气田开发过程中的井深测量是通过测电缆运行长度来实现的,而目前对电缆长度计量主要有井口马达和马丁代克两种计量方式。
  • It is important for the cable length to be suitable for the depth of the hole concerned.
    脚线的长度要适应于炮眼的深度,这一点是很重要的。
  • According to the mechanic characteristics of this system, the bearing cable, the stress-free cable length of carry cable and the meticulous algorithm of suspension force of each span are given, and the influence of gentle cable elongation on its dead weight is presented.
    文中根据该系统的力学特点,给出了承重索、轨索的无应力索长和各跨吊杆力的精细算法,并计入了柔索伸长对其自重集度的影响。
  • Starting from the pre-stressed state, the tension force was calculated by controlling the initial cable length.
    从预应力状态开始,通过控制索原长来追踪索在施工中的张拉力。
  • In this paper, to avoid the current-contact measurement of the drawbacks, a laser Doppler Effect based on the non-contact cable length measurement is used.
    本文针对现行接触式测量所存在的弊端,采用了一种基于激光多普勒效应的非接触式电缆长度测量方法。